Reference

Project name: WHP-E1 Four Slots Extenstion Project

End-user: Japan Vietnam Petroleum Limited Company (JVPC)

Location: WHP-E1 Rang Dong Field

Year: 2019

Our scope of supply including:

  • Provide new control cabinet with all the accessories as power supply, safety relay, terminal, cable, cable tray,...that means factory-fabricated integrated ICSS cabinet containing all hardware necessary for a complete system, fully assembled, fully programmed, fully tested and ready for installation.
  • Responsibility for the DeltaV control hardware functional testing when the Client deliver the goods to Vendor’s warehouse.
  • Provide Project Management and Engineering: Electrical and Mechanical Design; System Engineering; Project Documentation Package (as built drawings, wiring diagram, FAT, SAT procedures, execution plan, etc...).
  • Support for the installation and wiring inside the new control cabinet for PCS/SIS.
  • Provide all programming and configuration services which shall be executed in the Vendor's premises, using the Vendor's configuration tools.
  • Supply all the modification service of PCS database for new extension.
  • Supply all the configuration and programming for the SIS following the Causes & Effects Matrix as the requirements.
  • Engineering, Installation, Testing, Commissioning and hand over to JVPC.
  • Configuration/operation/maintenance training (hardware and software).